Downtime Entry

[TOC]

Entering Downtime

  1. Open DGS Manager

  2. Open the [Navigation Tree]( ).

  3. Find and expand the “Downtime” node. Click on the “Downtime Entry” node.

    Selecting Downtime Entry from Tree

  4. At the top of the screen, select your area:

Select Downtime Schedules

  1. You can now select which machine center you want to enter downtime details for. The top half contains downtime that has already been assigned. You may enter comments in the comments section beside any of them if you wish.

    Select Sawmill Schedule

  2. If you want to change the reason for the downtime, you may do so on the bottom half of the screen.

    Change Reason

  3. Once completed, Select Save.

    Save Downtime Entry

Adding a downtime event that DGS did not capture

In the event that the DGS does not capture an occurrence of downtime, it will be necessary to manually enter it. To do so, follow these steps:

  1. With DGS manager open to downtime entry, select the machine center for which you want to enter the event.

  1. Next, click the “Add Group” at the top right of the screen.

Adding Group

  1. From the drop boxes, select the reasons for the downtime and click the “Add” button.

    Clicking on Groups

  2. Lastly, enter the duration of the event and slick the save button at the top left of the screen.

Downtime Duration

How to split one event into two separate events

An option exists in DGS to take one downtime event and split it . This may be necessary when one machine has been down for a period of time for two different reasons.

-------permission

  1. Select the machine and the event you want to split.

    Note ::

    Machine for Split

  2. Next click the split button at the top right of the screen.

    Select Split

  3. From the pop up, code the events to what caused the secondary event after you have coded the event, you must adjust the amount of time you wish to split to. Increasing or decreasing the percentage of the split adjusts the time. Actual time is shown on the right. Once the coding and time have been completed, click on the split button and then the save button at the opt left of the screen.

    Split Downtime


[^1)]: Note : "You must select an event from the top half of the screen in order to be able to split it."